NFIP Elevation Certificate: Difference between revisions

From Equinox Wiki
No edit summary
No edit summary
 
(6 intermediate revisions by the same user not shown)
Line 4: Line 4:
Since October, 2021, their function has been repurposed to record the [[First Floor Height]] (FFH) measurement. Elevation Certificates are still required for LOMA applications.  
Since October, 2021, their function has been repurposed to record the [[First Floor Height]] (FFH) measurement. Elevation Certificates are still required for LOMA applications.  


'''''ECs are optional for NFIP insurance.'''''
[[File:Example-EC-d8crawl-2018-t-1.pdf|border|x400px|link=]]
 
<big>'''''ECs are optional for NFIP insurance.'''''</big>


{{call-eq
{{call-eq
Line 44: Line 46:
== Additional Resources ==
== Additional Resources ==
* [[:File:FEMA floodplain elevation-certificate-faq 2023.pdf|FEMA Floodplain Elevation Certificate FAQ]]
* [[:File:FEMA floodplain elevation-certificate-faq 2023.pdf|FEMA Floodplain Elevation Certificate FAQ]]


{{nfip}}
{{nfip}}

Latest revision as of 08:26, 3 March 2025

Elevation Certificates (ECs) were originally designed to provide detailed elevation data that was used to identify a building's floor elevation position relative to an established floodplain.

Since October, 2021, their function has been repurposed to record the First Floor Height (FFH) measurement. Elevation Certificates are still required for LOMA applications.

ECs are optional for NFIP insurance.

Use Equinox to Complete an EC

Required Information

Property Address:

  • Used to identify the building and/or geolocation
  • The owner's name is not required, as the EC is part of the public record

Building Diagram Number:

  • Identifies the type of foundation and structure
  • Used to determine the lowest floor of the building
  • Assistance is provided in the Equinox Wiki and/or the application process to assist in getting the corrent foundation information

Top of the Bottom Floor:

  • Typically the lowest floor of the building
  • If the foundation is basement or enclosure, then the Next Higher Floor is needed

Lowest Adjacent Grade (LAG):

  • The elevation of the ground next to the building's foundation
  • Used to determine sub-grade (below ground) foundations
  • Used to calculate First Floor Height

Sections of the EC

  • Section A of the Elevation Certificate is required. However during the application completion process in Equinox, the required information will automatically be moved into the Elevation Certificate form from the information provided in the application. Section B of the Elevation Certificate is also required. Section B is comprised of the Flood Insurance Rate Map (FIRM) information. This information is included as a third party lookup during the application process and is moved into the Elevation Certificate form during the application process.
  • Sections C, D, E, F, and G are no longer required.
  • Section H (New Addition):
    • May be used for all flood zones
    • Does require a minimum of two photographs (one of the front and one of the rear of the building) clearly showing the foundation of the building

Documentation Requirements

  • Include at least two photographs of the building’s front and rear, showing the foundation.
  • For buildings under construction, a revised EC must be submitted once construction is complete.

Additional Resources


This page contains information about the NFIP. Find more NFIP Resources.